South Surrey Park and Ride

The South Surrey Park and Ride is a major bus loop and park and ride facility serving the South Surrey area. As part of the TransLink system, it is used by five routes serving White Rock and South Surrey, including routes towards Vancouver via Bridgeport station in Richmond as well as routes to Newton and Surrey City Centre in the northern part of the city.

South Surrey Park and Ride
LocationBC 99 & King George Boulevard
Surrey, British Columbia
Canada
Coordinates49°04′20″N 122°49′21″W
Owned byTransLink
Bus routes5
Bus stands4
Construction
Parking840
Other information
Fare zone3
History
OpenedMay 8, 1991
Rebuilt1999, 2006

History

The first South Surrey Park and Ride opened on May 8, 1991, located at 152 Street and Cranley Drive (now mall access for Southpoint Exchange).[1] On December 13, 1999, the park and ride was relocated so that the Southpoint Exchange mall could be constructed. The second site was located at 32 Avenue and 32 Avenue Diversion, a short distance from the original site.[2][3] The third and current South Surrey park and ride facility was opened on June 26, 2006, adjacent to the Highway 99 and King George Boulevard interchange.[4]

In November 2013, an expansion of 367 parking spots was opened, and a $2-per-day parking fee was introduced.[5] In December 2020, a COVID-19 test centre opened at the park and ride.[6]

Routes

Bay Route Destination Notes
1 351 White Rock Centre
352 Ocean Park Weekday PM peak hours only
354 White Rock South Weekday PM peak hours only
2 321
  • White Rock Centre
  • White Rock South
394 White Rock Centre Weekday peak hours only
3 351 Bridgeport Station
352 Bridgeport Station Weekday AM peak hours only
354 Bridgeport Station Weekday AM peak hours only
4 321 Surrey Central Station
394 King George Station Weekday peak hours only

See also

References

  1. "Grade 12 Grads Ride free! Ride safely! GradPass" (PDF). The Buzzer. BC Transit. May 10, 1991. Retrieved February 23, 2017.
  2. "Further Service Improvements Commencing December 13" (PDF). The Buzzer. TransLink. December 10, 1999. Retrieved February 23, 2017.
  3. "4.6 South Surrey Park & Ride – Specific Project Approval" (PDF). TransLink. May 4, 2005. Retrieved February 23, 2017.
  4. "New South Surrey Park and Ride Reopens June 26". TransLink. June 13, 2006. Retrieved January 24, 2017.
  5. Poon, Christopher (January 21, 2014). "After $4.5M expansion, South Surrey Park and Ride lot sits empty, unused". Surrey Now-Leader. Retrieved June 26, 2016.
  6. Collins, Lauren (December 3, 2020). "Fraser Health to open COVID-19 test centre at South Surrey Park & Ride". Surrey Now-Leader. Archived from the original on December 3, 2020. Retrieved December 21, 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.