Barauni–Samastipur section
The Barauni–Samastipur section is a railway line connecting Barauni to Samastipur in the Indian state of Bihar. The 50.54 km (31 mi) line passes through the plains of North Bihar and the Gangetic Plain in Bihar.
Barauni–Samastipur section | |
---|---|
Samastipur Junction is an important station on Barauni–Samastipur section | |
Overview | |
Status | Operational |
Owner | Indian Railways |
Locale | Bihar |
Termini | Barauni Samastipur |
Stations | 11 |
Service | |
Type | Passenger and freight train line |
Services | |
Operator(s) | Indian Railways, East Central Railway |
Depot(s) | Freight terminals: Garhara Yard in Barauni and Karpurigram in Samastipur |
Rolling stock | WDM-2, WDM-3A, WDS-5, WDP-4 and WDG-4 |
History | |
Opened | 1886 |
Technical | |
Line length | 50.54 km (31 mi) |
Track length | 120 km (75 mi) |
Number of tracks | 2 (electrified) |
Track gauge | Broad gauge 1,676 mm (5 ft 6 in) |
Electrification | 25 kV 50 Hz AC OHLE (between 2011–December 2014) opened on 24 December 2014[1] |
Operating speed | up to 120 km/h (75 mph) |
Highest elevation | 55 m (180 ft) |
Electrification
Former Railway Minister Lalu Prasad Yadav announced for the electrification of the Barauni–Samastipur–Muzaffarpur–Hajipur line and Muzaffarpur–Gorakhpur line (via Hajipur, Raxaul and Sitamarhi) in the Rail Budget 2008. The electrification began in 2011 and was completed in 2014.[2]
The electrification work was completed in December 2014 itself. But the first passenger train to run with an electric locomotive was Maurya Express w.e.f. 23 November 2015.
Stations
There are 9 stations between Barauni and Samastipur Junction.[3]
Station code | Station name | Distance (km) |
---|---|---|
BJU | Barauni | 0 |
BUJ | Barauni Flag | 2.71 |
TGA | Teghra | 7.35 |
BCA | Bachwara Junction | 16.35 |
STJT | Sathajagat | 22.80 |
DSS | Dalsinghsarai | 27.34 |
BSRA | Basarhia Halt | 31.57 |
NAZJ | Nazirganj | 35.21 |
UJP | Ujiarpur | 41.49 |
BLRI | Belari Halt | 45.93 |
SPJ | Samastipur Junction | 50.54 |
Speed limit
The Barauni–Samastipur–Muzaffarpur–Hajipur line is not an A-Class line of Indian Railways. So maximum speed is restricted to 110 km/h.
Sidings and workshops
The following sidings and workshops exist on the line:[4]
- 100+ diesel locomotive yard capacity at Samastipur
- Freight terminal at Karpurigram railway station
- Workshop for wagon maintenance at Samastipur
- Barauni Thermal Power Station, Barauni
- Indian Oil Corporation, Barauni
- Major freight terminal at Garhara Yard
See also
References
- "सपना साकार, अब फर्राटे भरेगी विद्युत ट्रेन". Jagran (in Hindi). 22 December 2014.
- "पटरी पर दौड़ी सीआरएस की इलेक्ट्रिक ट्रेन". Jagran (in Hindi). 27 November 2014.
- "Indian Railways Map". India Rail Info.
- "Path Breaking Initiatives". East Central Railway. Archived from the original on 12 April 2016.
|