Madhupur–Giridih–Koderma line

Madhupur–Giridih–Koderma line is a 138 km (86 mi)-long single 1,676 mm (5 ft 6 in) broad-gauge track from Madhupur city in Deoghar district to Koderma city in Koderma district via Giridih city in Giridih district of Jharkhand state. It is an extended route of Madhupur–Giridih railway line. The Koderma–Maheshmunda section falls under Dhanbad Division of East Central Railway and Giridih–Madhupur section under Asansol Division of Eastern Railway. The construction of 110 km (68 mi) rail line from Koderma to Maheshmunda was done under supervision of Dhanbad Division of East Central Railway.[1]

Madhupur–Giridih–Koderma line
Giridih, an important railway station on Madhupur–Giridih–Koderma line
Overview
StatusOperational
OwnerIndian Railways
LocaleJharkhand, India
TerminiMadhupur Junction
Koderma Junction
Stations21 operational
Service
TypeElectrified
SystemBroad gauge
ServicesKoderma–Madhupur line
Operator(s)Eastern Railway
East Central Railway
History
Opened1871, 2012, 2015, 2019
Technical
Line length138 km (86 mi)
Number of tracks1
Track gauge1,676 mm (5 ft 6 in) Broad gauge
Operating speedUp to 110 km/h
Route map

km
138
Madhupur
132
Sugapahari
130
Sugapahari Halt
125
Jagadishpur
121
Krishna Ballabh Sahay Halt
111
0
Maheshmunda
11
Giridih
16
CPC Siding Giridih
104
0
New Giridih
Dhanbad–New Giridih line (planned)
Dhirabar River
12
Koimara
25
Fatehpur
32
Tundi
45
Maharajganj
Khudia River
59
Govindpur
70
Pradhankhanta
96
0
Salaia
Parasnath–New Giridih line (planned)
7
Lakhiatar Halt
14
Kumhar Tola
24
Madhuban
31
Chainpur Halt
38
Parasnath
93
Jitpur
86
Kawar
79
Jorasankh Halt
72
Jamua
62
Duriatanr Halt
55
Rema
49
Dhanwar
41
Rakesh Bagh Halt
33
Nawadih
28
Nawal Sahi Halt
20
Maheshpur Halt
10
Koderma Town
0
Koderma
km

History

Giridih railway station was built as a railway siding in 1871 by the British government in India (prior to the India's independence in 1947) mainly for transport of mineral reserve from the region. The contract for the railway siding was awarded in 1865 and the construction was completed in 1871.[2] The siding is owned by Central Coalfields Limited.[3]

A 110 km (68 mi) track from Koderma to Maheshmunda was constructed. This extended the Madhupur–Giridih railway line to Koderma, effectively making it a Madhupur–Giridih–Koderma line. A new railway station was built in Giridih named as New Giridih railway station (NGRH) which leaves out the already existing Giridih railway station (GRD) on this route, also making Maheshmunda a junction station. On 16 February 2019, Eastern Railway in its press-release announced a passenger train service w.e.f. 25 February 2019 from Koderma to Madhupur via New Giridih. Onward journey duration is of 4 hours and 5 minutes while the return journey duration is 4 hours and 25 minutes. Eastern Railway also announced another passenger train service w.e.f. 25 February 2019 from Koderma to Maheshmunda Junction through the same press-release. Onward journey duration is of 3 hours while the return journey duration is 3 hours and 10 minutes.[4]

Electrification

Madhupur–Giridih–Koderma line was completely electrified in October 2020.

Further extension

There are plans from the Railways ministry to connect New Giridih with Parasnath via Madhuban, for the convenience of the Jain pilgrims visiting Shikharji.[5] The foundation for the construction of new Parasnath–New Giridih rail line was laid in 2019. The 47 km-long railway line would incur a cost of Rs 972 crore on its construction and will have two crossing stations and a couple of halts. The cost of the project would be borne by the central and the state government in 50:50 ratio and a target has been set to complete the project by 2023.

There are other proposals as well to connect New Giridih with Dhanbad via Tundi and Govindpur,[6] and with Jhajha via Bengabad, Chakai and Sono. The first phase of the Jhajha–New Giridih rail line involves 20-km long Jhajha–Batia section, the foundation for which was laid in 2019 and which will be constructed at a cost of Rs 496 crore.

A final location survey for 7.54 km-long Madhupur bypass line was sanctioned in February 2020 after construction of which trains from Jasidih can run up to Giridih and Koderma without loco reversal at Madhupur. A delay of more than 30 minutes for an engine change at Madhupur will thus be avoided. The estimated cost of the linking project is Rs 281 crore.

Description

Following is the list of stations that are on MadhupurKoderma route via New Giridih.[7]

List of stations
S.No.StationStation Code
1MadhupurMDP
2Sugapahari TP-6/3SGPA
3Sugapahari Halt TP-7/11SAPT
4JagadishpurJGD
5Krishna Ballav Sahay HaltKBSH
6Maheshmunda JunctionMMD
7New GiridihNGRH
8SalaiyaSLIA
9KawarKWAR
10Jorasankh HaltJASH
11JamuaJAUA
12Duriyatanr HaltDUTR
13RemaREMA
14Raj DhanwarDNWR
15Rakesh Bagh HaltRHBH
16NawadihNWDH
17Nawasahi HaltNWSI
19Maheshpur A Cabin HaltMHSA
20Koderma TownKQRT
21Koderma JunctionKQR

Trains

Single passenger train run five times a day between Madhupur JunctionGiridih. The train service on Madhupur–Giridih rail route started in 1871. The passenger trains are run by Eastern Railway zone. The trains run five times daily except Thursdays and four times on Thursday.[8] The bogies of the express trains are attached to the passenger trains for movement in the Madhupur–Giridih route. Following are the trains arriving and departing from Giridih.[9][10]

Express trains
S.No.Train no.Train nameSource – Destination
123112Giridih Kolkata ExpressGiridih–Kolkata
223111Danapur ExpressGiridih–Danapur, Patna
383112Danapur Giridih ExpressDanapur, Patna–Giridih
413111-slipLal Quila Express SlipKolkata–Giridih
Passenger Trains
Sl.No.TRAIN NO.TRAIN NAME
153511Madhupur–Giridih Passenger
253512Giridih–Madhupur Passenger
353513Madhupur–Giridih Passenger
453514Giridih–Madhupur Passenger
553515Madhupur–Giridih Passenger
653516Giridih–Madhupur Passenger
753517Madhupur–Giridih Passenger
853518Giridih–Madhupur Passenger
953519Madhupur–Giridih Passenger
1053520Giridih–Madhupur Passenger

After the construction of Koderma–Maheshmunda section in 2019, new passenger trains were started on this route which are run by East Central Railway. Following are the trains running on this route via New Giridih.

Passenger trains
Sl.No.TRAIN NO.TRAIN NAME
153365Maheshmunda–Koderma Passenger
253366Koderma–Maheshmunda Passenger
353369Madhupur–Koderma Passenger
453370Koderma–Madhupur Passenger

See also

References

  1. "Railways conduct trial run on newly built track on Dhanbad Division". Times of India. 27 March 2010. Retrieved 27 March 2010.
  2. Akhtar, Shahnawaz (20 August 2009). "Ignored, Giridih station cries for care – Pilgrim spot fetches Rs 25cr for railways, but denied express trains". The Telegraph (Calcutta). Calcutta, India. Retrieved 31 March 2012.
  3. "Colliery Sidings East Railway". Official Website of the Eastern Railway. Archived from the original on 26 May 2012. Retrieved 1 April 2012.
  4. Railway, Eastern (16 February 2019). "pic.twitter.com/fol9xNXCuk". @EasternRailway. Retrieved 17 February 2019.
  5. "Giridih lauds Didi's budget – 'Madhuban link a blessing'". The Telegraph. Calcutta. 5 July 2009. Retrieved 31 March 2012.
  6. "मोदी सरकार ने खींचा धनबाद-गिरिडीह के बीच रेल लाइन का खाका". Dainik Jagran (in Hindi). Retrieved 23 February 2019.
  7. "List of Stations on Asansol Division". Official Website of Eastern Railway, Govt of India. Retrieved 7 April 2012.
  8. Akhtar, Shahnawaz (19 May 2008). "Coal mafia chokes trains". The Telegraph. Calcutta. Retrieved 31 March 2012.
  9. "Trains to Giridih". India Rail Info. Retrieved 31 March 2012.
  10. "Trains from Giridih". India Rail Info. Retrieved 31 March 2012.

|

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.