Expressways of India

Expressways are the highest class of roads in India. In India, expressways are controlled-access highways where entrance and exit is controlled by the use of ramps that are incorporated into the design of the expressway, whereas National highways are at-grade roads. Some roads are not access controlled, but are still officially called expressways, such as the Biju Expressway.

A section of Delhi–Noida Direct (DND) Flyway

The majority of the investment required for constructing expressways comes from the Central Government. Uttar Pradesh and Maharashtra are the only states which are investing in building expressways through dedicated expressway corporations.[1]

The National Expressways Authority of India (NEAI) operating under the Ministry of Road Transport and Highways will be in-charge of the construction and maintenance of expressways.[2] The National Highways Development Project by the Government of India aims to expand the country's current expressway network and plans to add an additional 18,637 km of greenfield expressways by 2022 apart from existing national highways.[3]

Bharatmala, a centrally-sponsored and funded road and highways project of the Government of India[4] with a target of constructing 83,677 km[5] of new highways over the next five years, was started in 2018.[6] Phase I of the Bharatmala project involves the construction of 34,800 km of highways (including the remaining projects under NHDP) at an estimated cost of ₹5.35 lakh crore by 2021–22.[7]

Characteristics

Currently, approximately 1,642.5 km of expressways are operational in India.

All the expressways are six or more-lane controlled-access highways where entrance and exit is controlled by the use of slip roads.

India has one of the lowest densities of expressways in the world.[8]

National expressways

Some expressways have been declared as national expressways and numbered as such, in the manner of national highways:

National Expressway 1: Ahmedabad–Vadodara Expressway, declared as NE 1 on March 13, 1986.[9]
National Expressway 2: Eastern Peripheral Expressway, declared as NE 2 on March 30, 2006.[10]
National Expressway 3: Delhi–Meerut Expressway, declared as NE 3 on June 18, 2020.[11]
National Expressway 4: Mumbai–Vadodara Expressway, declared as NE 4 on January 10, 2020.[12]
National Expressway 5: Delhi–Gurdaspur stretch of Delhi–Amritsar–Katra Expressway, declared as NE 5 on June 25, 2020.[13]
National Expressway 5A: Amritsar–Nakodar spur of Delhi–Amritsar–Katra Expressway, declared as NE 5A on September 17, 2020.[14]
National Expressway 6: Lucknow–Kanpur Expressway, declared as NE 6 on December 15, 2020.[15]

List of expressways

Only operational length is shown. Total length listed in this table is 1,822.5 km (1,132.4 mi). AC- Access controlled

Name States Length (km/mi) Lanes Year OSM Remarks
Agra–Lucknow Expressway (AC)[16]Uttar Pradesh302 km (187.7 mi) 6 2017 [17] Longest expressway in India[18]
Ahmedabad–Vadodara Expressway (AC)[19]Gujarat93.1 km (57.8 mi) 4 2004 National Expressway 1
Bangalore Elevated Tollway nice road, guragutepalya to nelamangala.

(AC)[20]

Karnataka90 km (55.9 mi) 4 2010
Chennai Bypass (AC)[21]Tamil Nadu32 km (19.9 mi) 4-6 2010 [22]
Delhi–Faridabad Skyway (AC)[23][24]Delhi, Haryana4.4 km (2.7 mi) 6 2010 Part of NH44
Delhi–Gurgaon Expressway[25]Delhi, Haryana27.7 km (17.2 mi) 6-8 2008 [26] Part of Golden Quadrilateral
Delhi–Meerut Expressway (AC)[27]Delhi, Uttar Pradesh31 km (19.3 mi)
(Partially opened)
6-14 2018 India's widest expressway[28]
Delhi–Noida Direct Flyway (AC)[29]Delhi, Uttar Pradesh9.2 km (5.7 mi) 8 2001
Eastern Freeway (Mumbai) (AC)[30][31][32]Maharashtra16.8 km (10.44 mi) 4-8 2013 [33]
Eastern Peripheral Expressway (AC)Uttar Pradesh, Haryana135 km (83.9 mi) 6 2018 [34] National Expressway 2
Elevated Road Amritsar[35]Punjab4.5 km (2.8 mi) 4 2014
Himalayan Expressway Punjab, Haryana, Himachal Pradesh 27.1 km (16.8 mi) 4
Hindon Elevated Road[36]Uttar Pradesh10.3 km (6.4 mi) 6 2018 [37]
Jaipur Elevated Road[38]Rajasthan8 km (5.0 mi) 4 2014
Mumbai–Pune Expressway (AC)[39]Maharashtra94.5 km (58.7 mi) 6 2002 [40] India's First 6 lane expressway
Noida–Greater Noida Expressway (AC)[41]Uttar Pradesh24.5 km (15.2 mi) 6 2012 [42]
Outer Ring Road, Chennai (AC)[43]Tamil Nadu60 km (37.3 mi) 6 2014 [44]
Outer Ring Road, Hyderabad (AC)[45]Telangana158 km (98.2 mi) 8 2018 [46]
P.V. Narasimha Rao Expressway (AC)[47][48]Telangana11.6 km (7.2 mi) 4 2009
Panipat Elevated Expressway[49]Haryana10 km (6.2 mi) 6 2008
Vijayawada–Guntur Expressway Andhra Pradesh 32 km (19.9 mi) 6 [50] Part of NH16
Vijayawada–Hyderabad Expressway (AC)[51] Andhra Pradesh, Telangana 181 km (112.5 mi) 6 2012 [52] Part of NH 65
Western Freeway (Mumbai) (AC)[53]Maharashtra29.3 km (18.2 mi)
(Partially opened)
4-8 2009
Western Peripheral Expressway (AC)Haryana135.6 km (84.3 mi) 6 2018 [54]
Yamuna Expressway (AC)[55][56]Uttar Pradesh165 km (102.5 mi) 6 2012 [57]
Total 1459.4 km (906.8 mi) 2020

Under construction

  • Construction yet to start

Total length listed in this table is 8,421 km (5,232.6 mi).

Name States Length (km/mi) Expected Date of Completion
Ahmedabad–Dholera Expressway* Gujarat 110 km (68 mi) March 2023
Airoli–Katai Naka Freeway Maharashtra 12.3 km (7.6 mi) March 2023
Amritsar–Jamnagar Expressway[58] Punjab, Haryana, Rajasthan, Gujarat 1,316 km (817.7 mi) 2022
Amritsar Ring Road[59] Punjab 98 km (60.9 mi) 2022
Bangalore–Mysore Infrastructure Corridor*[60] Karnataka 111 km (69.0 mi) January 2022
Bundelkhand Expressway[61] Uttar Pradesh 296 km (183.9 mi) December 2022
Chennai Port–Maduravoyal Expressway[62] Tamil Nadu 19 km (11.8 mi) 2023
Coastal Road (Mumbai) Maharashtra 29.2 km (18.1 mi) mid-2022
DND KMP Expressway Delhi 59 km (37 mi) 2022
Delhi–Amritsar–Katra Expressway*[63] Delhi, Haryana, Punjab, Jammu and Kashmir 687 km (427 mi) December 2023
Delhi–Meerut Expressway[64] Delhi, Uttar Pradesh 65 km (40.4 mi) December 2020
Delhi–Mumbai Expressway[65] Haryana, Rajasthan, Gujarat, Maharashtra, Madhya Pradesh 1,352 km (840 mi) 2022
Dwarka Expressway Delhi, Haryana 27.6 km (17.1 mi) May 2021
Delhi–Jaipur Expressway Haryana, Rajasthan 195.1 km (121.2 mi)
Faridabad–Noida–Ghaziabad Expressway Delhi, Haryana, Uttar Pradesh 56 km (35 mi)
Ganga Expressway* Uttar Pradesh 628 km (390.2 mi) 2025
Ambala–Narnaul Expressway (Trans-Haryana Expressway) Haryana 230 km (142.9 mi) end-2021
Gorakhpur Link Expressway[66] Uttar Pradesh 91 km (56.5 mi) March 2022
Lucknow–Kanpur Expressway* Uttar Pradesh 66 km (41 mi) October 2023
Loknayak Ganga Path[67] Bihar 21.5 km (13.4 mi) end-2022
Lucknow Outer Ring Road Uttar Pradesh 94 km (58 mi) 2021 December
Ludhiana Elevated corridor Punjab 13 km (8.1 mi)
Mumbai Trans Harbour Link Maharashtra 21.8 km (13.5 mi) mid-2022
Mumbai–Nagpur Expressway[68] Maharashtra 701 km (435.6 mi) May 2022
Peripheral Ring Road* Karnataka 65.5 km (40.7 mi)
Purvanchal Expressway[69] Uttar Pradesh 340.824 km (211.8 mi) January 2021
Raipur–Visakhapatnam Expressway Chhattisgarh, Odisha, Andhra Pradesh 465 km (288.9 mi) March 2024
Sohna Elevated Corridor[70] Delhi NCR 21 km (13.0 mi)
Varanasi Ring Road[71][72] Uttar Pradesh 63 km (39 mi)
Wazirabad–Mayur Vihar Elevated Expressway* Delhi NCR 18 km (11 mi)
Total 7,807.8 km (4,851 mi)

Planned/proposed

Name States Length (km/mi)
Outer Ring Road, Amaravati[73]Andhra Pradesh220 km (136.7 mi)
Amaravati–Anantapur Expressway[74]Andhra Pradesh371.03 km (230.5 mi)
Bangalore–Chennai Expressway[75]Karnataka, Tamil Nadu240 km (149.1 mi)
Bangalore–Mysore Infrastructure Corridor[60]Karnataka111 km (69.0 mi)
Chambal Expressway[76] Madhya Pradesh, Uttar Pradesh 404 km (251 mi)
Chennai Elevated Expressways[77]Tamil Nadu10 km (6.2 mi)
Chennai Surat Expressway[60]Gujarat, Maharashtra, Telangana, Karnataka, Andhra Pradesh, Tamil Nadu1,461 km (907.8 mi)
ORR Chennai, Phase II[78]Tamil Nadu33.1 km (20.6 mi)
Delhi–Saharanpur–Dehradun Expressway Delhi, Uttar Pradesh, Uttrakhand 180 km (110 mi)
GMADA Expressway Chandigarh, Haryana, Punjab 284 km (176 mi)
Kadapa Feeder Expressway[79]Andhra Pradesh104.05 km (64.7 mi)
Kurnool Feeder Expressway[79]Andhra Pradesh123.7 km (76.9 mi)
Nagpur–Hyderabad–Bengaluru Expressway[80] Maharashtra, Telangana, Andhra pradesh, Karnataka 1,100 km (680 mi)
Narmada Expressway[81] Madhya Pradesh 1,300 km (810 mi)
Raipur–Bilaspur Expressway[82] Chhattisgarh 127 km (79 mi)
Ganga Expressway Phase-2[83][84][85][86]Uttar Pradesh, Uttarakhand424 km (263.5 mi)
Varanasi Link Expressway[87][88] Uttar Pradesh 13 km (8.1 mi)
Nagpur–Vijayawada Expressway[89] Maharashtra , Telangana , Andhra Pradesh
Konkan Greenfield Expressway Maharashtra 500 km (310 mi)


Hyderabad–Raipur Expressway[89] Chhattisgarh , Telangana 330 km (210 mi)
Hyderabad–Indore Expressway[90] Madhya Pradesh , Telangana 713 km (443 mi)
Hyderabad–Visakhapatnam Expressway[91] Telangana , Andhra Pradesh
Indore–Kota Expressway[92] Rajasthan , Madhya Pradesh
Total  11,833.31km (7,352.88 mi)

Planned/proposed under Bharatmala

8-lane greenfield expressways under Bharatmala[93][94][95]
Name States Length (km/mi)
Ambala–Narnaul Expressway (Trans-Haryana Expressway) Haryana
Chennai–Salem ExpresswayTamil Nadu
Delhi–Bilaspur ExpresswayHimachal Pradesh
Delhi–Hisar Expressway Haryana
Durg–Arang ExpresswayChhattisgarh
Gurugram–Faridabad Expressway Haryana
Kharagpur–Siliguri Expressway West Bengal
Mangaluru–Chitradurga ExpresswayKarnataka
Pathankot–Ajmer Expressway[96] Rajasthan, Haryana, Punjab
Salem–Chengapalli ExpresswayTamil Nadu
Varanasi–Ranchi–Kolkata ExpresswayUttar Pradesh, Jharkhand, West Bengal

See also

Similar rail development
Similar roads development
Similar ports and river transport development
Similar air transport development
Highways in India
General

References

  1. "Maharashtra, UP to drive state-led capex in road sector in next 3 yrs - Times of India". The Times of India. Retrieved 1 June 2019.
  2. Dash, Dipak Kumar (23 November 2009). "By 2022, govt to lay 18,637km of expressways". Times of India.
  3. Kumar, Ashutosh. "Expressway cost pegged at Rs20 crore/km". Daily News and Analysis. Retrieved 16 September 2016.
  4. "Bharat Mala: PM Narendra Modi's planned Rs 14,000 crore road from Gujarat to Mizoram", The Economic Times, New Delhi, 29 April 2015
  5. "Government to infuse massive Rs 7 trn to build 83,677 km of roads over 5 years". The Financial Express. 30 October 2017. Retrieved 20 July 2020.
  6. GOI, Ministry of Road Transport and Highways. "Bharatmala Phase-I".
  7. "Bharatmala Pariyojana - A Stepping Stone towards New India | National Portal of India". www.india.gov.in. Retrieved 18 January 2018.
  8. Manchanda, Jyoti Mukul & Megha (24 May 2017). "NHAI to have new wings for global projects, expressways". Business Standard India. Retrieved 7 June 2017.
  9. Notification dated March 13, 1986
  10. Notification dated March 30, 2006
  11. Notification dated June 18, 2020
  12. Notification dated January 10, 2020
  13. Notification dated June 25, 2020
  14. Notification dated September 17, 2020
  15. Notification dated December 15, 2020
  16. "IAF fighter planes to welcome inauguration". Nyooz. Archived from the original on 13 January 2017. Retrieved 23 February 2017.
  17. https://www.openstreetmap.org/relation/6303141
  18. "Agra-Lucknow Expressway: India's longest greenfield expressway reduces travel time between Delhi-Lucknow to 6 hours; 10 facts to know". Financial Express. Retrieved 21 November 2016.
  19. "Ahmedabad-Vadodara Expressway Project". Cclindia.com. Retrieved 16 September 2010.
  20. "Expressway elevates commuting". Deccan Herald. Retrieved 16 July 2010.
  21. "PIB Foundation stone for Phase II of Chennai Bypass". PIB. Archived from the original on 28 September 2007. Retrieved 25 February 2017.
  22. https://www.openstreetmap.org/relation/1183546
  23. "Delhi Faridabad Expressway". Archived from the original on 1 January 2016.
  24. "Badarpur flyover to open today". The Times of India. 5 October 2010.
  25. "Excess cars made tolling a taxing truth at first: Expressway builder". Express India. Archived from the original on 20 November 2008. Retrieved 16 September 2015.
  26. https://www.openstreetmap.org/relation/5694117
  27. PM Modi Inaugurates Delhi-Meerut Expressway, Will Also Open Eastern Peripheral Expressway Today: 10 Facts, NDTV
  28. "All you need to know about Delhi-Meerut Expressway". Hindustan Times. Retrieved 27 May 2018.
  29. "Welcome to DND Flyway". Dndflyway.com. 22 July 2009. Retrieved 16 July 2010.
  30. "Phase 1 of Eastern Freeway opens to public". The Indian Express. 15 June 2013. Retrieved 24 June 2013.
  31. Somit Sen (17 June 2014). "Traffic runs smooth on Eastern Freeway, motorists reach office in record time". The Times of India. TNN. Retrieved 19 June 2014.
  32. "CM inaugurates Eastern Freeway, Kherwadi flyover in Mumbai". The Hindu. 16 June 2014. Retrieved 19 June 2014.
  33. https://www.openstreetmap.org/relation/8428060
  34. https://www.openstreetmap.org/relation/7237808
  35. Roy, Vijay C. (4 April 2006). "Amritsar elevated road project to be completed in 1 yr". Business Standard India. Retrieved 20 July 2020.
  36. "indias-longest-elevated-road-inaugurated-by-yogi-adityanath-top-10-facts-about-the-project". 30 March 2018. Retrieved 30 March 2018.
  37. https://www.openstreetmap.org/relation/8429969
  38. "Elevated road to open this mth". The Times of India. 11 September 2014. Retrieved 29 October 2014.
  39. ""Mumbai-Pune Expressway, India"". Road Traffic Technology. Retrieved 21 August 2010.
  40. https://www.openstreetmap.org/relation/1247233
  41. "Noida: An idea that has worked". The Times of India. 4 June 2003.
  42. https://www.openstreetmap.org/relation/8428026
  43. "Chennai Outer Ring Road will now be known as SH 234".
  44. https://www.openstreetmap.org/relation/8428024
  45. "Another Outer Ring Road stretch to be opened today". TOI. Retrieved 16 July 2010.
  46. https://www.openstreetmap.org/relation/7149978
  47. "Longest Elevated Expressway inaugurated in Hyderabad | India Trends". Indiatrends.info. 20 October 2009. Archived from the original on 21 July 2011. Retrieved 16 July 2010.
  48. "Hyderabad gets India's longest flyover". NDTV. Retrieved 16 July 2010.
  49. "Panipat elevated highway inaugurated". Projectsmonitor.com. Archived from the original on 14 January 2010. Retrieved 16 July 2010.
  50. Jonathan, P. Samuel (23 October 2018). "Soon, no two-wheelers on Vijayawada-Guntur NH stretch". The Hindu. ISSN 0971-751X. Retrieved 19 January 2021.
  51. Dara, Gopi (17 October 2020). "On Jagan's wishlist to Gadkari: New national highways for AP". The Times of India. Retrieved 19 January 2021.
  52. "GMR Hyderabad Vijayawada Expressways Private Limited Information - GMR Hyderabad Vijayawada Expressways Private Limited Company Profile, GMR Hyderabad Vijayawada Expressways Private Limited News on The Economic Times". The Economic Times. Retrieved 19 January 2021.
  53. "Hunt resumes for consultant for Rs 8,000-cr western freeway". The Times of India. 21 April 2013. Retrieved 26 June 2013.
  54. https://www.openstreetmap.org/relation/8427980
  55. "Facts About Yamuna Expressway". Projects Jugaad. 5 October 2013. Retrieved 6 December 2013.
  56. "Yamuna Expressway Project". Yamuna Expressway Industrial Development Authority. Archived from the original on 7 December 2013. Retrieved 6 December 2013.
  57. https://www.openstreetmap.org/relation/2258068
  58. "Nitin Gadkari's ambitious infrastructure plan: 5 new greenfield highways to come up on major routes". The Financial Express. 14 May 2018. Retrieved 2 September 2018.
  59. "Outer ring road for Amritsar". Dainik Jagran. 10 June 2020. Retrieved 10 June 2020.
  60. "Bangalore Mysore Infrastructure Corridor Area Planning Authority". Retrieved 16 August 2012.
  61. "Bundelkhand Expressway construction would start from 2018". ANI. 24 November 2017.
  62. "Chennai Port-Maduravoyal corridor to have 6 lanes". The Hindu. 15 March 2018. Retrieved 30 May 2018.
  63. "NHAI nod for Asr-Delhi highway extension". The Tribune. 19 April 2017. Archived from the original on 2 October 2017. Retrieved 2 October 2017.
  64. "NH-24 in Delhi to be 14-laned for Meerut Expressway". The Times of India.
  65. "Govt announces plans to build Delhi-Mumbai expressway for Rs 1 lakh crore". Hindustan Times.
  66. "Gorakhpur link expressway". Retrieved 14 November 2019.
  67. "Loknayak Ganga Path". Retrieved 13 January 2020.
  68. "Work on Nagpur-Mumbai expressway begins in full swing - Times of India". The Times of India.
  69. "PM Narendra Modi to lay foundation stone of Purvanchal Expressway amid BJP, SP war over 'credit'". Zee News. 14 July 2018. Retrieved 14 July 2018.
  70. "Sohna road expressway". Retrieved 13 January 2019.
  71. "New projects in Purvanchal".
  72. "NHAI plans to develop Model Stretches in every state".
  73. "Outer ringroad for Amaravathi". The Times of India. 8 December 2015. Retrieved 8 December 2015.
  74. "Amaravati-Anantapur highway to cost Rs 27,635 crore".
  75. "Project report on Bangalore-Chennai Expressway may get ready by March". The Hindu. 21 October 2011. Archived from the original on 2 May 2012. Retrieved 16 August 2012.
  76. "Nitin Gadkari gifts Narmada, Chambal Expressways". Free Press. Retrieved 8 October 2017.
  77. "Chennai Elevated Road" (PDF). CMDA. Retrieved 9 January 2016.
  78. "Highways - Chennai Outer Ring Road". GMR. Archived from the original on 13 April 2010. Retrieved 9 January 2016.
  79. "Green Field Express Way (Anantapur to Amaravati)".
  80. Ramakrishnan, N (3 January 2018). "Feedback Infra pitches for a big role in designing greenfield expressways". Business Line. Archived from the original on 31 May 2018. Retrieved 31 May 2018.
  81. "Centre approves Chambal, Narmada Expressways in MP". Times of India. Retrieved 8 October 2017.
  82. "Details About Raipur-Bilaspur Expressway". www.indiamapped.com.
  83. "Proposed Alignment" (PDF).
  84. "Ganga e-way alignment plans ready for UP CM's nod".
  85. "7 bids for Upper Ganga Canal Expressway". Financialexpress.com. 11 March 2010. Retrieved 16 July 2010.
  86. "No state consent, NHAI goes ahead with four-laning of highway section". Indian Tollways. 3 December 2009. Archived from the original on 6 December 2009. Retrieved 16 July 2010.
  87. "UPEIDA".
  88. "Development of Purvanchal Expressway" (PDF).
  89. "NHAI chalks out plan to build 22 greenfield expressways by FY25". Construction Week Online India. Retrieved 4 June 2020.
  90. "23 new expressways and highways coming up in next 5 years". Times of India. Retrieved 13 August 2020.
  91. "23 new expressways and highways coming up in next 5 years". Times of India. Retrieved 13 August 2020.
  92. "23 new expressways and highways coming up in next 5 years". Times of India. Retrieved 13 August 2020.
  93. Sood, Jyotika (9 July 2018). "Govt may launch 7 greenfield projects under Bharatmala". Mint. Retrieved 13 July 2018.
  94. "Raipur-Vizag Expressway Proj under Bharatmala Project: Centre". The Pioneer. Retrieved 4 August 2018.
  95. "bharatmala-2-0-to-focus-on-expressways-add-4000-km-greenfield-roads". The Times of India. January 2019. Retrieved 2 January 2019.
  96. "NHAI ने दी मंजूरी- अजमेर-जालंधर ग्रीनफील्ड के लिए 4 जिलों में होगी भू-अवाप्ति". Dainik Bhaskar (in Hindi). Retrieved 2 September 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.