Line 10 (Chongqing Rail Transit)

Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017.[1] Rapid trains started operating on Line 10 in June 2020.[2]

Line 10
 10 
Sanyawan Station platform
Overview
Native name重庆轨道交通10号线
StatusOperational
Line number10
LocaleChongqing, China
TerminiWangjiazhuang
Liyuchi
Stations19
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017 (2017-12-28)
Technical
Line length34 km (21 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
Electrification1500 V DC Overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Lanhua
Lanhua Road Depot
(ACW) Loop line (CW)
Nanhu
 Loop 
Wanshoulu
Nanping
 3 
Nanbinlu
Nanjimen Bridge
across Yangtze River
Qixinggang
 1 
Auditorium
Zengjiayan
 2 
Zengjiayan Bridge
across Jialing River
Liyuchi
 9 
Hongtudi
 6 
Longtousi Park
S Square of Chongqing
N Railway Station
 Loop   3 
N Square of Chongqing
N Railway Station
 4 
Line 4 to Tangjiatuo
Line 4 to Min'an
Minxinjiayuan
Sanyawan
Line 9 to Xinqiao
Shangwanlu
 9 
Line 9 to Huashigou
Huanshan Park
Changhe
Zhujiawan Depot
Jiangbei Airport
Terminal 3
Jiangbei Airport
Terminal 2
 3 
Yubei Square
Lushan
Central Park East
 9 
Central Park
Central Park West
 5 
Line 5 to Yuegangbeilu
Line 5 to Tiaodeng
Yuelai
 6I 
Wangjiazhuang Depot
Wangjiazhuang
 6I 

Opening timeline

SegmentCommencementLengthStation(s)Name
Wangjiazhuang Liyuchi 28 December 2017 33.7 km (20.94 mi) 18 Phase 1
S. Square of Chongqing N. Railway Station 28 December 2018 infill station 1

Stations (north to south)

Service
routes
Station
Station name Connections Distance
km
Location
R L English Chinese
10/27 Wangjiazhuang 王家庄  6I  Yubei
| 10/26 Yuelai 悦来  6I  2.04 2.04
| 10/25 Central Park West 中央公园西  5  2.71 4.75
| 10/24 Central Park 中央公园 1.09 5.84
| 10/23 Central Park East 中央公园东  9  0.82 6.66
| 10/22 Lushan 鹿山 1.64 8.30
| 10/21 Yubei Square 渝北广场 2.05 10.35
10/20 Terminal 2 of Jiangbei Airport 江北机场T2航站楼  3   CKG 0.74 11.09
10/19 Terminal 3 of Jiangbei Airport 江北机场T3航站楼 CKG 2.22 13.31
| 10/18 Changhe 长河 5.31 18.62
| 10/17 Huanshan Park 环山公园 1.85 20.47
| 10/16 Shangwanlu 上湾路  9  1.67 22.14
| 10/15 Sanyawan 三亚湾 2.74 24.88
| 10/14 Minxinjiayuan 民心佳园 2.08 26.96
10/13 Chongqing North Station (North Square)[lower-alpha 1] 重庆北站北广场  4   YW  CUW 2.61 29.57
10/12 Chongqing North Station (South Square)[lower-alpha 1] 重庆北站南广场  3   Loop   YW  CUW 0.60 30.17
| 10/11 Longtousi Park 龙头寺公园 0.87 31.04
10/10 Hongtudi 红土地  6  1.63 32.67 Jiangbei
10/09 Liyuchi 鲤鱼池  9  1.09 33.76

Phase II (Under construction)

  • Under construction
Station
Station name Connections Distance
km
Location
English Chinese
10/08 Zengjiayan 曾家岩  2  Yuzhong
10/07 Auditorium 大礼堂
10/06 Qixinggang 七星岗  1 
10/05 Nanbinlu 南滨路 Nan'an
10/04 Nanping 南坪  3 
10/03 Wanshoulu 万寿路
10/02 Nanhu 南湖  Loop 
10/01 Lanhualu 兰花路

Notes

  1. The former translation is North/South Square of Chongqingbei Railway Station, which has been changed since the opening of the Line 10's station

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.