Terminal 2 of Jiangbei Airport station
Terminal 2 of Jiangbei Airport, previously known simply as Jiangbei Airport, is an interchange station of Line 3 (straddle beam monorail) and Line 10 (heavy rail subway) of Chongqing Rail Transit in Yubei District of Chongqing Municipality, China.[1][2] The station opened in 2011 with Line 3 and was expanded in 2017 with Line 10, alongside changing to its current name to differentiate itself from the station at Terminal 3A of the airport.
Location | Chongqing China | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Operated by | Chongqing Rail Transit Corp., Ltd | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 side platforms and 1 island platform) | |||||||||||||||
Connections |
| |||||||||||||||
Construction | ||||||||||||||||
Structure type | Below ground | |||||||||||||||
Disabled access | 5 accessible elevators | |||||||||||||||
Other information | ||||||||||||||||
Station code | 3/39、10/20 | |||||||||||||||
History | ||||||||||||||||
Opened |
| |||||||||||||||
Previous names | Jiangbei Airport | |||||||||||||||
Services | ||||||||||||||||
|
It serves the airport terminals in which the station's name derived from (Terminals 2A & 2B of Chongqing Jiangbei International Airport) and its surrounding area, including Terminal 1 before its temporary closure since 2017.
Station Structure
Line 3 Platforms
- Platform Layout
There are 2 side platforms for Line 3 trains. Only 1 platform is in use as the station is the terminal station for North-bound trains. These trains switch beam (monorail tracks) from right to left before entering the station and stopping at the platform for South-bound trains, where they would terminate. Trains then let south-bound passengers board and would head for that direction (towards Yudong).
Side Platform Doors open on the right (Platform not in use) | ||||
To 3 Terminal 2 of Jiangbei Airport | Track not in use | 3/39 |
Track not in use | ↓ ← |
---|---|---|---|---|
Trains terminate here | ←→ | 3/39 |
←→ | To 3 Yudong |
Side Platform Doors open on the right |
Line 10 Platform
- Platform Layout
An island platform is used for Line 10 trains travelling in both directions.
To 10 Liyuchi & Lanhualu | ← | 10/20 |
← | ||
---|---|---|---|---|---|
Island Platform
Doors open on the left |
|||||
→ | 10/20 |
→ | To 10 Wangjiazhuang |
Exits
There are a total of 8 entrances/exits for the station.
Exit | To | |
---|---|---|
1 | Car park | |
2 | Terminal 1 (temporarily closed), VIP Service Area C | |
3 | Domestic Arrivals A, Domestic Arrivals B, Long distance buses | |
4 | Domestic Departures, Airport buses, Taxis, the Airport Cargo Terminal, VIP Service Areas A & B | |
5 | Car park | |
6A | Long distance buses, Domestic Arrivals A, Domestic Departures, Airport buses, Taxis | |
6B | Long distance buses, Domestic Arrivals B, Domestic Departures, Airport buses, Taxis | |
7 | Jinhang Road, Binggang Road, Yixue Road, The People's Government of Chongqing Yubei District |
Surroundings
- Chongqing Jiangbei International Airport
- Terminal 3 of Jiangbei Airport station (a Line 10 Station)
See also
- Chongqing Jiangbei International Airport
- Chongqing Rail Transit (CRT)
- Line 3 (CRT)
- Line 10 (CRT)