Greater Anglia (train operating company)
Greater Anglia (legal name Abellio East Anglia Limited)[1] is a train operating company in Great Britain owned as a joint venture by Abellio, the international arm of the state-owned Dutch national rail operator Nederlandse Spoorwegen, and the Japanese trading company Mitsui & Co. It operates the East Anglia franchise, providing the commuter and intercity services from its Central London terminus at London Liverpool Street to Essex, Suffolk, Norfolk and parts of Hertfordshire and Cambridgeshire as well as many regional services throughout the East of England.
Class 745 at Colchester in February 2020 | |||
Franchise(s) | Greater Anglia 5 February 2012 – 15 October 2016 East Anglia 16 October 2016 – 11 October 2025 | ||
---|---|---|---|
Main region(s) | Cambridgeshire, Essex, Norfolk & Suffolk | ||
Other region(s) | London & Hertfordshire | ||
Fleet size | |||
Stations called at | 170 | ||
Stations operated | 154 | ||
Parent company | Abellio (60%) Mitsui & Co. (40%) | ||
Other | |||
Website | greateranglia | ||
|
Abellio began operating the franchise, then known as the Greater Anglia franchise, in February 2012. Initially, it traded under the same name until it rebranded as Abellio Greater Anglia in December 2013. Shortly after taking over operations, the company initiated a series of projects to improve service levels, including the procurement of new trains and the launch of the 'Norwich in 90' programme to reduce travel times between several major locations on its network. In May 2015, Greater Anglia's stopping metro services were transferred to London Overground and the precursor to Crossrail, TfL Rail.
The franchise was re-tendered as the East Anglia franchise, and awarded to Abellio in August 2016. The company resumed trading as Greater Anglia on 16 October 2016 when the new franchise commenced. In January 2017, Abellio announced that subject to gaining Department for Transport approval, it had agreed to sell a 40% stake in the business to Mitsui. Since the completion of the sale in March 2017, Greater Anglia has incorporated several Japanese planning tools and practices. Trade unions have objected to some of the changes made by the company, leading to industrial action in 2017 and 2018 as a result of the dispute.
History
Background
In December 2003, the Strategic Rail Authority awarded the Greater Anglia franchise to National Express, which began operations on 1 April 2004, initially under the brand-name One.[2][3] The franchise was to run until March 2011, with provision for a three-year extension if performance targets were met. In November 2009, the Department for Transport (DfT) announced that National Express would not be granted the three-year extension even though it had met the performance criteria, beccause National Express East Coast had defaulted on the InterCity East Coast franchise.[4][5]
Following a change of government as a result of the 2010 general election, the DfT announced in June 2010 that all refranchising would be put on hold while a process review was conducted.[6] As a result, National Express East Anglia was granted an initial extension until October 2011, followed by another until February 2012.[7]
In March 2011, the DfT announced that Abellio, Go-Ahead, and Stagecoach had been shortlisted to bid for the franchise.[8] In October 2011, the new franchise was awarded to Abellio; accordingly, the services previously operated by National Express East Anglia were transferred to Greater Anglia on 5 February 2012.[9][10][11]
The Greater Anglia franchise was originally to run until July 2014; the reason for awarding a short franchise at a time when the government was speaking of its desire for longer franchises was to allow the government to digest the recommendations of the McNulty Rail Value for Money study before letting a long-term franchise. In March 2013, the Secretary of State for Transport announced the franchise would again be extended until 15 October 2016.[12] Greater Anglia was rebranded as Abellio Greater Anglia in December 2013.[13]
Changes
Prior to Greater Anglia, the last period of substantial investment in the region had been nearly 30 years earlier, specifically the electrification of the line north of Ipswich.[14] At the commencement of the franchise, railway commentator Philip Haigh observed that the region's services had changed little since the BR days, and that change was overdue. During the negotiations for the award of the franchise, Greater Anglia pledged to undertake numerous investments that would improve the various services and facilities offered.[14] On 4 November 2014, the Great Eastern Main Line Taskforce released its investment analysis report, which included a detailed breakdown of several proposed investments in the region's rail network.[14]
One major initiative that was commenced by Greater Anglia shortly after it took over operations was the 'Norwich in 90' campaign, aimed at introducing faster journey times, such as between London and Colchester within 40 minutes, London and Ipswich in 60 minutes, and London and Norwich in 90 minutes.[14] Several organisations, including Norfolk County Council, had been calling for such a scheme to be undertaken since as early as 2009. Abello had acknowledged such calls in 2012, but could not justify making very substantial investments during the initial franchise period due to the short timescale involved.[14] The creation of the Great Eastern Rail Taskforce in 2013 was seen as a major step towards this. In 2015, Chloe Smith, Norwich North MP and co-chairman of the taskforce, noted that the scheme was as much a political effort as it was an engineering one.[14]
By the 2010s, the region's rail infrastructure was relatively worn-out and prone to unreliability. Modernisation efforts would therefore focus not only on improving absolute speeds but on reducing failure rates as well.[14] This work is being undertaken as a multiagency effort, involving not only infrastructure changes carried out by Network Rail and various civil engineering companies, but also the procurement of new rolling stock and other efforts. It was recognised early on that, for the intercity services to be meaningfully speeded up, slower regional trains could not feasibly be overtaken or avoided on the mostly twin-track line, so that services overall would need to be accelerated.[14] There has also been an aspiration to increase the number of trains between Norwich and London to three per hour, although capacity constraints such as the single-track section in the vicinity of the Trowse Swing Bridge would need to be overcome to facilitate this.[14]
Some services have been transferred from Greater Anglia's management to other rail operators. On 31 May 2015, the Liverpool Street to Enfield Town, Cheshunt (via Seven Sisters) and Chingford services, as well as the Romford to Upminster service, were transferred to London Overground Rail Operations.[15] On the same day, the Liverpool Street to Shenfield stopping services were also transferred to the TfL Rail concession managed by MTR.[16]
In June 2015, an Abellio (60%)/Stagecoach (40%) joint venture, FirstGroup and National Express were shortlisted to bid for the franchise.[17] In December 2015, it was announced that Stagecoach had pulled out of the joint bid with Abellio, and that Abellio would continue the bid alone.[18] In August 2016, it was announced that Abellio had successfully retained the franchise until 2025. One commitment of the new franchise period is the purchase of 1,043 new carriages, 660 from Bombardier Transportation's Derby Litchurch Lane Works with the remainder being built by Stadler Rail.[19][20] In January 2017, Abellio announced that, subject to gaining DfT approval, it had agreed to sell a 40% stake in the business to Mitsui.[21] The sale was completed in March 2017.[22] Reportedly, Greater Anglia has incorporated numerous planning and operational practices of the Japanese railways, such as the use of digital twin simulation software for analysing performance and developing its timetables, since the acquisition.[23]
In August 2017, amidst a background of ongoing rail strikes on a national level, Greater Anglia conductors voted in favour of going on strike in a dispute over planned ticket office closures and the planned introduction of more widespread driver-only operation on the Greater Anglia network.[24] On numerous occasions since October 2017, industrial action has been taken by portions of the company's employees, and the principal matter of dispute has seen no effective resolution. The National Union of Rail, Maritime and Transport Workers (RMT) has accused Greater Anglia of conducting alleged strike-breaking tactics and claimed that its use of stand-in conductors led to passengers' safety being jeopardised.[25][26] The dispute between Greater Anglia and the RMT continued into 2018, with further strikes threatened during the summer that affected around 40 percent of the operator's services.[27]
Franchise commitments
Greater Anglia franchise (2012–2016)
A number of improvements were planned during the first franchise period (2012-2016) which included:[9]
- Improved station and ticket facilities and better information for passengers;
- A text messaging service to keep passengers informed of any disruptions;
- Extending Oyster card pay-as-you-go capabilities between London Liverpool Street and Shenfield/Hertford East;
- Mobile-phone and print-at-home ticketing facilities;
- 600 extra car park spaces at stations;
- Additional bicycle storage facilities;
- New automatic ticket barriers at Brentwood (no automatic ticket barrier was installed by Abellio Greater Anglia and management of the station later passed to TfL Rail).
East Anglia franchise (2016–2025)
The following improvements have been planned as part of the Abellio bid for the East Anglia franchise (2016-2025):[28]
- Replacement of the entire current fleet, with 1,043 new vehicles by September 2020 to run on the Regional, Intercity, Dutchflyer, Stansted Express, West Anglia and Great Eastern routes.
- Extensive refurbishment of some of the existing vehicles, prior to replacement.
- Raise Public Performance Measure scores to at least 92.9%.
- Two weekday trains operating between Norwich and Ipswich to London with a journey time of 90 min and 60 min respectively.[29]
- Free WiFi on trains and stations.
- £60 million investment for station upgrades with a focus on Broxbourne, Cambridge, Cheshunt, Harlow Town and Southend Victoria stations.
- Introduction of digital information screens on all stations with improvements in car and cycle parking (1,800 and 4,000 extra spaces respectively) along with upgrades to ticket offices and vending machines.
- New ticketing programmes with offers for infrequent travellers and part-time workers.
- Introduction of an automatic Delay Repay service for season and advance ticket holders.
- £120 million of investment into depots with a new maintenance facility at Manningtree.
- Hiring of twenty trainees per year and at least thirty apprenticeships by 2019.
- Extension of the Gainsborough Line from Marks Tey to Colchester Town.[30]
- Reintroduction of four direct Lowestoft to London services on the East Suffolk Line.
- Improving the frequency of the Ipswich to Ely Line services to Peterborough from every two hours to hourly with some additional services extending to Colchester.
- Improving the frequency of the Ipswich to Cambridge Line and East Suffolk Line services from every two hours to hourly respectively on Sundays.
Services
As of December 2019, the following services operate during the off-peak period, Monday to Saturday:[31]
Intercity | |||
---|---|---|---|
Route | tph | Calling at | Stock |
London Liverpool Street - Norwich | 1 | Colchester, Manningtree, Ipswich, Diss | 321, 745 |
1 | Stratford[lower-alpha 1], Chelmsford, Colchester, Manningtree, Ipswich, Stowmarket, Diss | ||
Great Eastern | |||
Route | tph | Calling at | Stock |
London Liverpool Street - Southend Victoria | 3 | Stratford, Romford (1tph), Shenfield, Billericay, Wickford, Rayleigh, Hockley, Rochford, Southend Airport, Prittlewell | 321, 322, 720 |
Wickford - Southminster | 1 1⁄2 | Battlesbridge, South Woodham Ferrers, North Fambridge, Althorne, Burnham-on-Crouch | |
London Liverpool Street - Ipswich | 1 | Stratford, Shenfield, Chelmsford, Hatfield Peverel, Witham, Kelvedon, Marks Tey, Colchester, Manningtree 2tpd continue to Stowmarket | 321, 322, 720 |
London Liverpool Street - Colchester Town | 1 | Stratford, Romford, Shenfield, Chelmsford, Witham, Kelvedon, Marks Tey, Colchester | |
London Liverpool Street - Clacton-on-Sea | 1 | Stratford, Shenfield, Ingatestone, Chelmsford, Witham, Colchester, Wivenhoe, Thorpe-le-Soken | |
London Liverpool Street - Braintree | 1 | Stratford, Shenfield, Ingatestone, Chelmsford, Witham, White Notley, Cressing, Braintree Freeport | |
Colchester - Walton-on-the-Naze | 1 | Colchester Town (trains reverse), Hythe, Wivenhoe, Alresford, Great Bentley, Weeley, Thorpe-le-Soken, Kirby Cross, Frinton-on-Sea | |
Colchester - Colchester Town | 1 | ||
Manningtree - Harwich Town | 1 | Mistley, Wrabness, Harwich International, Dovercourt | |
Marks Tey - Sudbury | 1 | Chappel & Wakes Colne, Bures | 755 |
West Anglia | |||
Route | tph | Calling at | Stock |
London Liverpool Street - Hertford East | 2 | Hackney Downs, Tottenham Hale, Ponders End, Brimsdown, Enfield Lock, Waltham Cross, Cheshunt, Broxbourne, Rye House, St Margarets, Ware | 317, 379 |
Stratford - Meridian Water | 2 | Lea Bridge, Tottenham Hale, Northumberland Park | |
Stratford - Bishop's Stortford | 1 | Lea Bridge, Tottenham Hale, Waltham Cross, Cheshunt, Broxbourne, Harlow Town, Sawbridgeworth | |
1 | Lea Bridge, Tottenham Hale, Northumberland Park, Enfield Lock, Cheshunt, Broxbourne, Roydon, Harlow Town, Harlow Mill, Sawbridgeworth | ||
London Liverpool Street - Cambridge North | 1 | Tottenham Hale, Cheshunt, Broxbourne, Harlow Town, Bishop's Stortford, Audley End, Whittlesford Parkway, Cambridge | |
1 | Tottenham Hale, Cheshunt, Broxbourne, Roydon, Harlow Town, Harlow Mill, Sawbridgeworth, Bishop's Stortford, Stansted Mountfitchet, Elsenham, Newport, Audley End, Great Chesterford, Whittlesford Parkway, Shelford, Cambridge | ||
Regional | |||
Route | tph | Calling at | Stock |
Ipswich - Felixstowe | 1 | Westerfield, Derby Road, Trimley | 755 |
Ipswich - Lowestoft | 1 | Woodbridge, Melton, Wickham Market, Saxmundham, Darsham, Halesworth, Brampton,[lower-alpha 2] Beccles, Oulton Broad South | |
Ipswich - Cambridge | 1 | Needham Market, Stowmarket, Elmswell, Thurston, Bury St Edmunds, Kennett (1tp2h), Newmarket, Dullingham (1tp2h) Kennett and Dullingham are served by alternate trains. | |
Ipswich - Peterborough | 1⁄2 | Stowmarket, Bury St Edmunds, Ely, Manea, March, Whittlesea | |
Norwich - Sheringham | 1⁄2 | Salhouse (Norwich-bound only), Hoveton & Wroxham, Worstead (Sheringham-bound only), North Walsham, Cromer (trains reverse), West Runton | |
1⁄2 | Salhouse (Sheringham-bound only), Hoveton & Wroxham, Worstead (Norwich-bound only), North Walsham, Gunton, Roughton Road, Cromer (trains reverse), West Runton | ||
Norwich - Great Yarmouth | 1 | Brundall Gardens, Brundall, Lingwood, Acle | |
2tpd | Brundall Gardens, Brundall, Buckenham, Cantley, Reedham, Berney Arms | ||
Norwich - Lowestoft | 1⁄2 | Oulton Broad North | |
1⁄2 | Brundall, Buckenham[lower-alpha 2] (limited), Cantley, Reedham, Haddiscoe, Somerleyton, Oulton Broad North | ||
Norwich - Stansted Airport | 1 | Wymondham, Spooner Row[lower-alpha 2] (limited), Attleborough, Eccles Road (limited), Harling Road (limited), Thetford, Brandon, Lakenheath[lower-alpha 2] (limited), Shippea Hill[lower-alpha 2] (limited), Ely, Cambridge North, Cambridge, Whittlesford Parkway, Audley End | |
Airport rail link
Greater Anglia operates the Stansted Express sub-branded airport rail link between London Liverpool Street and Stansted Airport.[32]
Stansted Express | |||
---|---|---|---|
Route | tph | Calling at | Stock |
London Liverpool Street - Stansted Airport | 2 | Tottenham Hale, Bishop's Stortford | 745 |
2 | Tottenham Hale, Harlow Town, Stansted Mountfitchet (1tph) | ||
Boat train
Greater Anglia operates the Dutchflyer sub-branded boat train between London Liverpool Street and Harwich International.[33] There is no special livery for trains.
Dutchflyer | |||
---|---|---|---|
Route | tpd | Calling at | Stock |
London Liverpool Street - Harwich International | 4 | Stratford, Shenfield, Chelmsford, Witham, Kelvedon, Marks Tey, Colchester, Manningtree | 321, 322 |
Cambridge - Harwich International | 1 | Dullingham, Newmarket, Kennett, Bury St Edmunds, Thurston, Elmswell, Stowmarket, Needham Market, Ipswich | 755 |
Lowestoft - Harwich International | 1 | Oulton Broad South, Beccles, Brampton, Halesworth, Darsham, Saxmundham, Wickham Market, Melton, Woodbridge, Ipswich |
Performance
Punctuality statistics released by Network Rail for period 7 of 2013/2014 were 94.0% PPM (Public Performance Measure), down 1.0 percentage point on the same period ine the previous year, and the MAA (Moving Annual Average) up to 12 October 2013 also fell slightly to 92.3%.[34] In 2013, Abellio Greater Anglia was named train operator of the year.[35] However, a survey in February 2014 by the consumer group Which? found that customer satisfaction with Abellio Greater Anglia was at last place (out of 20 train operators) with a satisfaction percentage of 40%,[36] and in 2016 Abellio Greater Anglia was rated the fourth worst UK train operator with a commuter rail services satisfaction rating of 35%.[37]
Forecasts issued during the mid-2010s predicted that demand on the GEML into London from Suffolk and Norfolk was expected to grow by 32 percent, while demand from Essex was to go up by 52 percent.[14] This prediction was in spite of the relatively low levels of subsidies provided for Greater Anglia's operations, and the general lack of improvements in prior years; according to industry periodical Rail, it was the second least subsidised passenger operator by 2015.[14]
Rolling stock
Greater Anglia inherited a fleet of Class 90, Mark 3 carriages, Driving Van Trailers, Class 153, Class 156 and Class 170 diesel multiple units, and Class 315, Class 317, Class 321, Class 360 and Class 379 electric multiple units from National Express East Anglia. Due to its short initial franchise term, Greater Anglia was not planning to introduce any new trains,[38] although this policy changed substantially following the start of its second franchise term in October 2016.
In November 2013, an online petition was launched, aimed at stopping Greater Anglia's trains from dumping raw sewage from the train toilets directly onto the tracks.[39] There were also concerns with the 'sewage mist' from passing trains making Network Rail staff ill, and Greater Anglia announced it was "working closely" with the government to introduce a fleet upgrade.[40] By October 2016, all the franchise's Mark 3 carriages and Class 156 multiple units had been refitted with controlled emission toilets.[41]
On 31 May 2015, the company's fleet of Class 315 trains were cascaded to London Overground and TfL Rail, and some Class 317 trains have been cascaded to London Overground, which has taken over local services in North and East London from the Greater Anglia franchise.[15]
In August 2016, it was announced 1,043 new carriages would be purchased, which will allow for all of the ageing stock to be replaced, especially necessary given that a number of coaches are not compliant with accessibility requirements beyond 2020 and they would not be able to meet Abellio's new targets for lower journey times without extensive modification.[42][43] One part of the contract went to Bombardier with nearly £1 billion to build 111 Bombardier Aventra electric multiple units and the other part of the purchase went to Stadler to build 58 FLIRT electric multiple units, all of which would enter service between August 2019 and September 2020.[20][28][44]
Bombardier's order included all 111 Class 720 units for taking over local and commuter services out of Liverpool Street.[45] Stadler's order included 20 twelve-carriage Class 745 units for taking over intercity services on the Great Eastern Main Line and the Stansted Express[46] as well as 38 three- and four-carriage Class 755 units for taking over all local diesel services from the previous outdated rolling stock.[47] By July 2020, all Class 755 trains have entered passenger service.[48]
The first unit of the new order to enter service was the Class 755 fleet, of which the first one entered service on 29 July 2019 on the Norwich to Great Yarmouth and Lowestoft route.[49] The next of the order was the Class 745/0 fleet, of which the first one entered service on 8 January 2020 on the Great Eastern Main Line operating services between Norwich and Liverpool Street.[50] Following the introduction of these units, the loco-hauled Class 90 sets have all been withdrawn from service, with the last set running its last services on 24 March 2020.[51]
In March 2020, testing of the new Class 720 fleet finally began and is continuing to be done despite the ongoing COVID-19 pandemic in order to allow the first unit to enter service within the next few months.[52][53] In June 2020, the units were authorised to enter passenger service and after further testing and crew training, the first two units finally entered service on 26 November 2020 as a pairing on the Shenfield to Southend Line.[54][55]
Beginning in June 2020, Class 360s began moving to Kings Heath TMD, Northampton for modifications by Siemens to make them 110mph in preparation for their transfer to East Midlands Railway.[56] Due to delays in commissioning the Class 720s and to allow the Class 360s to be released, three Class 321/9s and five Class 322s, last used by Northern Trains were leased from July 2020.[57][58] The first unit bound for East Midlands Railway, 360120, moved to Cricklewood Depot on 10 November 2020, with all having transferred to EMR by the end of January 2021.
Current fleet
Trainset | Class | Image | Type | Top speed | Carriages | No. | Routes operated | Built | |
---|---|---|---|---|---|---|---|---|---|
mph | km/h | ||||||||
Shunting locomotive | |||||||||
08 | Shunter | 15 | 24 | N/A | 3 | Stock movements | 1952–1962 | ||
Electric multiple units | |||||||||
BR Second Generation (Mark 3) | 317/1 | EMU | 100 | 161 | 4 | 12 | Fen Line Hertford East Branch Line West Anglia Main Line |
1981–1982 | |
317/5 | 14 | ||||||||
317/6 | 9 | 1985–1987 | |||||||
317/7 | 8 | 1981-1982 | |||||||
317/8 | 6 | ||||||||
| |||||||||
321/3 | EMU | 100 | 161 | 4 | 65 | Braintree Branch Line Crouch Valley Line Dutchflyer Great Eastern Main Line Mayflower Line Shenfield to Southend Line Sunshine Coast Line |
1988–1991 | ||
321/4 | 33 | ||||||||
321/9 | 3 | ||||||||
322[59][60] | EMU | 100 | 161 | 4 | 5 | Braintree Branch Line Crouch Valley Line Dutchflyer Great Eastern Main Line Mayflower Line Shenfield to Southend Line Sunshine Coast Line |
1990 | ||
Bombardier Electrostar | 379 | EMU | 100 | 160 | 4 | 30 | Fen Line West Anglia Main Line |
2010–2011 | |
Bombardier Aventra | 720/5 | EMU | 100 | 160 | 5 | 89 (10 in service) | Fen Line Hertford East Branch Line West Anglia Main Line Braintree Branch Line Crouch Valley Line Dutchflyer Great Eastern Main Line Shenfield to Southend Line Sunshine Coast Line |
2018–2021 | |
Stadler FLIRT | 745/0 | EMU | 100 | 161 | 12 | 10 | Great Eastern Main Line | 2018-2020 | |
745/1 | EMU | 100 | 161 | 12 | 10 | Stansted Express | 2018-2020 | ||
Bi-mode multiple units | |||||||||
Stadler FLIRT | 755/3 | BMU | 100 | 161 | 3 | 14 | Wherry Lines Breckland Line Bittern Line East Suffolk Line West Anglia Main Line Felixstowe Branch Line Ipswich to Cambridge Line Gainsborough Line |
2018-2020 | |
755/4 | BMU | 100 | 161 | 4 | 24 | Wherry Lines Breckland Line Bittern Line East Suffolk Line West Anglia Main Line Felixstowe Branch Line Ipswich to Cambridge Line Gainsborough Line |
2018-2020 | ||
Future fleet
Since November 2020, the 720/5 units have began to enter passenger service, while the additional 720/5 units (numbered 720101-720144) are still currently in production and will begin operation in 2021.
Trainset | Class | Image | Type | Top speed | Carriages | Number | Routes operated | Built | Into service | |
---|---|---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||||
Bombardier Aventra | 720/5 | EMU | 100 | 160 | 5 | 44 | Fen Line Hertford East Branch Line West Anglia Main Line Braintree Branch Line Crouch Valley Line Dutchflyer Great Eastern Main Line Shenfield to Southend Line Sunshine Coast Line |
TBC | 2021 | |
Past fleet
Former train types operated by Greater Anglia include:
Trainset | Class | Image | Type | Top speed | Cars | Number | Built | Routes | Notes | |
---|---|---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||||
Locomotive hauled stock | ||||||||||
37 | Diesel | 80 | 130 | N/A | 4 | 1960-1965 | Wherry Lines |
| ||
Stadler UKLight | 68 | 100 | 161 | 3 | 2013-2017 | |||||
Mark 2 | Carriage | 13 | 1963-1975 | |||||||
90 | Electric | 110 | 177 | 9 | 15 | 1987–1990 | Great Eastern Main Line | Transferred to Freightliner (13 locos) and Locomotive Services Limited (2 locos)[61] | ||
Mark 3 | Carriage | 125 | 201 | 130 | 1975–1988 |
| ||||
Driving Van Trailer | Control car | 15 | 1988-1990 | |||||||
Diesel multiple units | ||||||||||
Super Sprinter | 153 | DMU | 75 | 121 | 1 | 5 | 1991-1992 | Wherry Lines Breckland Line Bittern Line East Suffolk Line Felixstowe Branch Line Ipswich to Cambridge Line Gainsborough Line |
Transferred to Transport for Wales in 2019 | |
156 | 2 | 9 | 1987-1988 | Transferred to East Midlands Railway in 2019-20 | ||||||
Bombardier Turbostar | 170/2 | 100 | 161 | 2 | 4 | 2002 | Transferred to Transport for Wales in 2019-20 | |||
3 | 8 | 1999 | ||||||||
| ||||||||||
Electric multiple units | ||||||||||
BREL 1972 | 315 | EMU | 75 | 121 | 4 | 61 | 1980-1981 | Shenfield Metro Lea Valley Lines Romford-Upminster Line |
All transferred in 2015 to TfL Rail (44 units) and London Overground (17 units) | |
BR Second Generation (Mark 3) | 317/5 | 100 | 161 | 4 | 2 | 1981-1982 | Fen Line Hertford East Branch Line West Anglia Main Line |
| ||
317/6 | 15 | 1985-1987 | Fen Line Hertford East Branch Line West Anglia Main Line |
| ||||||
317/7 | 9 | 1981-1982 | Lea Valley Lines |
| ||||||
317/8 | 6 | |||||||||
321 | 100 | 161 | 4 | 2 | 1988-1991 | Braintree Branch Line Crouch Valley Line Dutchflyer Great Eastern Main Line Mayflower Line Shenfield to Southend Line Sunshine Coast Line |
Transferred to Abellio ScotRail in 2018 (Converted to Class 320/4s) | |||
2 | Converted to Class 600 in 2020. | |||||||||
2 | ||||||||||
Desiro | Class 360/1 | 110 | 177 | 4 | 21 | 2002-2003 | Braintree Branch Line Dutchflyer Great Eastern Main Line Mayflower Line Sunshine Coast Line |
Transferred to East Midlands Railway in 2020-21 | ||
Depots
Greater Anglia's fleet is maintained at Clacton-on-Sea, Ilford and Crown Point depots.[62][63][64]
Notes
- Pick up only northbound, set down only southbound
- Request stop
References
- "Companies House extract company no 7861414: Abellio East Anglia Limited". companieshouse.gov.uk. Retrieved 23 January 2021.
- "National Express Group Announced as Preferred Bidder for new Greater Anglia Franchise" (Press release). Strategic Rail Authority. 22 December 2003. Archived from the original on 4 January 2004.
- "National Express wins rail franchise". The Daily Telegraph. London. 22 December 2003. Archived from the original on 24 July 2018. Retrieved 28 January 2021.
- "National Express loses East Anglia rail franchise". BBC News. 26 November 2009. Archived from the original on 10 February 2017. Retrieved 28 January 2021.
- Millward, David (26 November 2009). "National Express loses East Anglia franchise three years early". The Daily Telegraph. London.
- "Rail Franchising". Department for Transport. 17 June 2010.
- Osborne, Alistair (15 September 2010). "National Express wins extension to East Anglia rail franchise". The Daily Telegraph. London.
- "Shortlisted Bidders for Greater Anglia and Intercity West Coast Rail Franchises" (PDF). Department for Transport. 24 March 2011. Archived from the original (PDF) on 6 June 2013.
- "Better services for East Anglian passengers under new franchise" (Press release). Department for Transport. 20 October 2011.
- "Abellio awarded Greater Anglia franchise". Railway Gazette International. London. 20 October 2011.
- "Abellio has been awarded the Greater Anglia Franchise" (Press release). Abellio. 20 October 2011. Archived from the original on 25 October 2011. Retrieved 2 November 2012.
- "Railway plan puts new focus on passengers". Department for Transport. 26 March 2013.
- "Mitsui & Co / East Japan Railway Company". railpro.co.uk. Retrieved 23 January 2021.
- Clinnick, Richard (22 July 2015). "The knock-on benefits of 'Norwich in 90'". Rail. Peterborough.
- London Overground operator appointed to run additional services for TfL Archived 17 May 2015 at the Wayback Machine Travel & Tour World 4 June 2013.
- "TfL announces MTR to run Crossrail services". Transport for London. 18 July 2014.
- "Shortlist for East Anglia franchise announced". Department for Transport. 2 June 2015.
- "Stagecoach pulls out of East Anglia rail franchise bid". BBC News. 9 December 2015.
- "Better journeys for rail passengers and boost for Derby train industry as new East Anglia franchise announced" (Press release). Department for Transport. 10 August 2016.
- "Bombardier gets £1bn contract in biggest rail boost since Victorian era". BBC News. 10 August 2016.
- "Abellio to sell 40% stake in Greater Anglia to Mitsui". Railway Gazette International. London. 17 January 2017.
- "Abellio deal: Japanese firm Mitsui completes 40% Greater Anglia sale". BBC News. 21 March 2017. Retrieved 21 March 2017.
- "Greater Anglia to utilise Japanese know-how to improve train punctuality". Global Railway Review. 10 September 2019.
- "Dates confirmed for two strikes by Greater Anglia train staff". ITV News. 19 September 2017.
- "Doors opened on wrong side of train during rail strike". BBC News. 5 October 2017.
- "RMT alerts MPs and Safety Regulator over Greater Anglia" (Press release). Rail, Maritime and Transport Union. 3 October 2017.
- "Statement regarding planned strikes - 16 and 23 June" (Press release). Greater Anglia. 1 June 2018.
- "Stadler and Bombardier to supply trains for Abellio East Anglia franchise". Railway Gazette International. 10 August 2016.
- "Norwich in 90 and Ipswich in 60". Greater Anglia. Retrieved 30 October 2019.
- "Sudbury, Peterborough and Lowestoft get a better link for commuters as Abellio signs new franchise for Greater Anglia services". East Anglian Daily Times. Ipswich. 11 August 2016.
- "Timetables". Abellio Greater Anglia. Retrieved 23 January 2021.
- "Stansted Express". Greater Anglia. Retrieved 7 February 2012.
- "Dutchflyer". Stena Line. Retrieved 28 February 2013.
- "Rail performance results period 7". Network Rail. Archived from the original on 8 December 2015. Retrieved 26 December 2013.
- "Greater Anglia named train operator of the year". Rail Business Awards. Retrieved 26 December 2013.
- "Best and worst UK train companies". Which?. 17 February 2014. Retrieved 21 February 2014.
- "Best and worst UK train companies". Which?. 30 November 2016. Retrieved 16 June 2017.
- "Greater Anglia franchise agreement" (PDF). Department for Transport. 1 November 2011. Archived from the original (PDF) on 19 December 2013.
- "Commuters demand end to raw toilet waste being dumped at Liverpool Street station". Metro. London. 18 December 2013.
- "Cambridge rail worker's health fears over excrement spray". BBC News. 18 December 2013.
- "600,000 extra seats and smarter trains following completion of intercity fleet refurbishment" (Press release). Greater Anglia. 19 September 2016.
- "Class 317 Angel Covering Letter" (PDF). Department for Transport. 23 April 2010.
- "Abellio Greater Anglia/ Stansted Express". National Rail Enquiries. Retrieved 23 January 2021.
- "Abellio wins East Anglian rail franchise for nine years in £1.4bn deal". East Anglian Daily Times. Ipswich. 10 August 2016.
- "Greater Anglia's first Class 720 commuter EMU delivered for testing". Railway Gazette International. 16 January 2020. Retrieved 25 January 2020.
- "First new Greater Anglia Intercity train arrives in East Anglia". North Norfolk Radio. Norwich. 30 May 2019. Archived from the original on 25 January 2020. Retrieved 25 January 2020.
- Holden, Michael (11 June 2019). "ORR authorise 24 Class 755 trains to enter service". RailAdvent. Retrieved 25 January 2020.
- Clinnick, Richard (24 July 2020). "All Class 755 bi-modes have now carried passengers". Twitter.
- "Stadler bimodes enter service at Greater Anglia". Railway Gazette International. 29 July 2019. Retrieved 25 January 2020.
- "Greater Anglia's first Stadler inter-city trainset enters service". Railway Gazette International. 9 January 2020. Retrieved 25 January 2020.
- Geater, Paul. "End of the line for traditional trains on Greater Anglia routes". East Anglian Daily Times. Retrieved 31 March 2020.
- "Greater Anglia's new electric trains complete test run". www.railtechnologymagazine.com. Retrieved 31 March 2020.
- "Testing of Greater Anglia's new electric trains continues amid coronavirus outbreak". ITV News. Retrieved 31 March 2020.
- "New Greater Anglia trains authorised to enter passenger service". RailAdvent. 12 June 2020. Retrieved 27 November 2020.
- "Greater Anglia Class 720 Aventra EMUs enter service". Railway Gazette International. 27 November 2020. Retrieved 29 November 2020.
- "Greater Anglia Class 360/1s being readied for East Midlands switch". Rail. No. 908. 1 July 2020. p. 26.
- "Stored stock makes way for deliveries of new vehicles". Rail. No. 904. 6 May 2020. p. 25.
- "All GA 755s in passenger service". Rail. No. 911. 12 August 2020. p. 29.
- Stored stock makes way for deliveries of new vehicles Rail issue 904 6 May 2020 page 25
- All GA 755s in passenger service Rail issue 911 12 August 2020 page 29
- Geater, Paul. "Electric locomotives line up before journey to new life away from East Anglia". East Anglian Daily Times. Retrieved 28 April 2020.
- "Greater Anglia's £40m refurb of Crown Point Depot begins". Rail Technology Magazine. 24 April 2018.
- "12th November 2016 1754 Clacton-on-Sea to Clacton Carriage Servicing Depot". Realtime Trains. Retrieved 12 November 2016.
- "12th November 2016 2140 Maryland to Ilford EMU Depot". Realtime Trains. Retrieved 12 November 2016.
External links
Media related to Abellio Greater Anglia at Wikimedia Commons
Preceded by National Express East Anglia |
Operator of Greater Anglia franchise 2012 – 2016 |
Succeeded by Greater Anglia East Anglia franchise |
Preceded by Abellio Greater Anglia Greater Anglia franchise |
Operator of East Anglia franchise 2016 – 2025 |
Incumbent |