Walnut Creek station
Walnut Creek station is an elevated Bay Area Rapid Transit (BART) station in Walnut Creek, California, served by the Antioch–SFO/Millbrae line. The station is located north of downtown Walnut Creek, adjacent to Interstate 680 and near the Ygnacio Valley Road and California Boulevard arterial roads.
Walnut Creek station in November 2019 | |||||||||||
Location | 200 Ygnacio Valley Road Walnut Creek, California | ||||||||||
Coordinates | 37.905724°N 122.067332°W | ||||||||||
Line(s) | BART C-Line | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | County Connection: 1, 4, 5, 9, 14, 21, 93X, 95X, 96X, 98X, 311, 321 SolTrans: Yellow | ||||||||||
Construction | |||||||||||
Parking | 2,089 spaces | ||||||||||
Bicycle facilities | 64 lockers | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opened | May 21, 1973 | ||||||||||
Passengers | |||||||||||
2020 | 6,246 (weekday average)[1] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
History
Walnut Creek station opened on May 21, 1973 as part of an extension from MacArthur to Concord.[2]
Due to Walnut Creek's high ridership and large catchment area, BART proposed in 2004 that the station be the center of a transit-oriented development scheme which includes 440 residential units, 8,700 sq ft (810 m2) of office space, 33,000 sq ft (3,100 m2) of retail space, and 1,373 parking spaces.[3] A parking lot on the west side of the station closed on February 3, 2018. A 900-space parking garage was constructed in its place, which allowed other parking lots to be closed for the new development.[4] The new garage, which includes a three-lane bus plaza, opened on March 29, 2019.[5]
Station layout
Walnut Creek station has two side platforms with two tracks. Access to the tracks is provided by a staircase, escalator, and elevator from the mezzanine, which houses nine faregates.[3] Sustained patronage at the station has caused it to become overcrowded; BART is planning on building a second entrance, including new faregates and platform access to relieve possible emergency hazards.[3]
Bus connections
Pleasant Hill/Contra Costa Centre is a transfer point for a number of County Connection local and express routes:
- Weekday: 1, 4, 5, 9, 14, 21, 93X, 95X, 96X, 98X
- Weekend: 311, 321
The station is also served by the SolTrans Solano Express Yellow Line.
All buses stop in the busway inside the south garage.[6]
References
- "Monthly Ridership Reports". San Francisco Bay Area Rapid Transit District. February 2020.
- "BART Chronology January 1947 – March 2009" (PDF). San Francisco Bay Area Rapid Transit District. March 2009. Archived from the original (PDF) on October 13, 2013.
- "Walnut Creek Comprehensive Station Plan" (PDF). San Francisco Bay Area Rapid Transit District. June 2004. Archived from the original (PDF) on November 20, 2010.
- "New parking garage construction on the south lot at Walnut Creek Station begins" (Press release). San Francisco Bay Area Rapid Transit District. January 30, 2018.
- "New South Garage at Walnut Creek Station opens 3/29" (Press release). San Francisco Bay Area Rapid Transit District. March 18, 2019.
- "Transit Stops: Walnut Creek Station" (PDF). Metropolitan Transportation Commission. June 19, 2019.